Mechanical Engineering Senior Design Project 2005-2006

UMaine Home | Mechanical Engineering Home
subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Non-Point Source Polluting Lawn Mower - Milestones

small logo

Milestones

This page is an overview of our milestones for the Fall '05 Semester as well as the Spring '06 semester.

 

 

Project Files:

Final Report in .doc
Blade testing lab results in .pdf
2nd Semester Revised Milestones in .pdf
3rd Generation (final design) Blade Attachement CAD Drawing. View1. View2.
Midterm Report Completed download in .pdf
2nd Generation Blade Attachment Cad Drawing here. (E-drawings Viewer + Internet Explorer 5.5 Required Download here.)
1st Generation Blade Attachment Cad Drawing here. (E-drawings Viewer + Internet Explorer 5.5 Required Download here.)
Engine selection data sheet created view in .pdf. Purchase order for Briggs & Stratton Etek motor made. View data sheet for the motor here.
Power source selection matrix created view in .pdf. Also power source spec sheet created view in .pdf.
Milestones finalized. Download in .pdf

 

DATE

COMPLETED

MILESTONE

September 27, 2005
Done
Safety training completed
October 11, 2006
Done
Calculate power requirements for typical lawn to accurately size battery/fuel cells Use an existing electric lawnmower to measure power consumption by recording the amperage draw while mowing a defined size lawn
October 18, 2005
Done
Decision for mode of power source using pro’s/con’s of electric, solar, fuel cells and biofuel when power, mowing time, and cost are compared
November 11, 2005
Done
Engine and blade sizing completed, begin CAD drawings using Solid Works for critical components
November 18, 2005
Done
Decision which parts to buy and which to acquire from old parts. Complete the purchase request form for power supply
December 20, 2005
Presentation of first semester results
January 31, 2006
check
Machine piece to connect the blade to the motor shaft
February 7, 2006
check
Purchase different types of blades and perform lab to find the optimal blade for the lawnmower
February 17, 2006
check
Set up lab to test the performance of the motor at different voltages(24V, 36V, 48V) for choosing final battery size
February 20, 2006
check
Fill out purchase request form for the final battery
February 28, 2006
check
Plot battery curve with motor as well as torque vs. time or power vs. discharge
March 14, 2006
check
Research and design control board, which will charge the battery, damp out initial amp spike, protect system from burnout, and a safety shut-off
March 28, 2006
check
Finish design of removable battery packaging as well as cowl for the mower and other final cosmetics
April 11 2006
check
Finish assembly of lawnmower and design test on standard grass
May 3, 2006
check
Set up of projects for final review
May 4, 2006
check
Open house, operational review of project
May 10, 2006
check
Final Project Report due

 