1)  Proposal for Modified Milestones

9/15/06

check
Project Description

2)  Preliminary Performance Specifications

9/22/06

check
Team Members

3)  Literature Review and Final Design Specifications

10/06/06

check
Final Design

4)  Meeting with Tom Hosmer-Presentation of  the Project

10/12/06

check 

5)  Web Page

10/13/06

check 

6)  Completed Sketches of Optional Designs

10/27/06

 check

Deformation of the Barrel at
1,5,10,15,20,25,30,inch

 

7)  Milestone Review

11/03/06

check 
Deformation due to weight at
10 inch and entire barrel

8)  Final Design Specifications of Air Gun

11/10/06

check 

Drawings:1,2,3,4,5,6,7,8,9,10,11,12,13

9)  Preliminary Drawings of Final Design Including All Components and Assembly

11/24/06

check

 

10)  Midterm Report

12/08/06

check

 Solid models:  Front,Back,Right,Iso

Solid works

11)  Final Drawing Package of Air Gun

12/15/06

check

 

12)  Materials Ordered

12/15/06

check


  

Project Milestones  Part 2

Links

         Milestone

Date

Completed


1)  Proposal for Modified Milestones of  part 2

01/19/07

check

2)  Barrels preparation: drilling,reaming, honing. Also manufacturing of the corresponding striker bars.

01/26/07

check

3)  Manufacturing of the adapters and  the flange connecting barrel to the reservoir system.

02/02/07

check

4)  Manufacturing of the stand: I-beam and legs. Milling,drilling,tapping and welding procedures.

02/09/07

 check

5) Assembly of the tank,pressure gage, solenoid valve and the barrel. Manufacturing of the support plates with applicable adapters. Milling, drilling and tapping procedures.

02/16/07

 check

6)  Complete assembly of the apparatus.

02/23/07

 check


 

7)  Measuring of the vacuum pump performance- EXPERIMENTAL 

03/02/07

 check

8)  Velocity Measuring System completed.

03/30/07

 ceck

9)  Velocity-pressure testing using the VMS - EXPERIMENTAL

04/13/07

ceck

 

10) Propagation Wave Testing

04/27/07

ceck