![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Human Powered Submarine Controls Development and Testing 2006-2007 ![]() Milestones HPS Design IV
Milestones:
Status
• September 15, 2006 – Become Crosby Certified with Art (Done) • Perform Online Safety Training (Done) • Machine Training with Art (Done) • September 17, 2006 - Obtain toolbox from Art (Done) • September 20, 2006 - Collaborate with group members on steps forward (Done) • September 25, 2006 - Proposal of Milestones (Done) • October 25, 2006 - Tow Tank Certification complete (Done) • October 28, 2006 – HPS Competition (Bethesda, Maryland) paperwork complete (Done) • October 28, 2006 – Website up and running (Done) • Design Prototype manual controls • October 10th, 2006 – Solidworks drawings (Done) • November 5, 2006 – Machined parts (Done) • November 24, 2006 – Assembly of design (Done) • November 26, 2006 –Testing of manual control design (Done) • December 10, 2006 – Complete fixes to manual control design (Done) • January 20, 2007 – Destin new flatbar handle assembly (Done) • February 15, 2007 – Handle design mounted with complete weld (Done) • November 7, 2006 – Test sub in water (Castine) (Done) • December 15, 2006 – Update Website (Done) • Joystick Optimization • November 22, 2006 – Test Controls and Joystick fixes (Done) • December 8, 2006 – Complete Basic Stamp programming (Done) • December 10, 2006 – Basic Stamp demonstration (Done) • April 27, 2007 – Basic Stamp improvement demonstration (if necessary) • June 20, 2007 – Joystick and Controls Complete • Drive Link Reliability • February 10, 2007 – Drive link design plan discussed and established (Done) • March 3, 2007 – Prototype drive link machined (Done) • April 25, 2007 – Complete fixes to prototype and finalization in progress (Done) • April 25, 2007 – Drive link reliability complete (Done) • Scuba Certification • October 10, 2006 – Scuba Certification Identified (Done) • January 20, 2007 – Scuba classroom lessons complete (Done) • April 23, 2007 – First Pool Dive Completed (Done) • April 26, 2007 – Second Pool Dive Competed (Done) • Ice Out (TBA) – Open Water Dive Completed (May Work) • Ice Out (TBA) – Scuba Certification Complete (May Work) • Ice Out (TBA) – Christopher Rigaud Certification Complete (In Progress) • February 3, 2007 – Updated Milestones completed and sent to Mick (Done) • February 6, 2007 - Update Webpage with fixes to pictures, milestones, reports, and links (Done) • Servo Mount Optimization • March 23, 2007 – Servo Mount sketches (Done) • March 30, 2007 – Stuffing Box Mount Sketches (Done) • April 30, 2007 – Stuffing Box / Servo Mount assembled (Done) • May 3, 2007 – Servo Mount tested (Done) • Auto-Pilot Optimization (On Hold For Next Year’s Team) • February 2, 2007 – Meet with MMA Professor for Electronics (Done) • On Hold for Next Year – Program fixes into basic stamp for new auto-pilot equipment (Delayed) • April 13, 2007 – Open House for Hosmer Lab Dedication (Done) • April 27, 2007 – Update Webpage with new pictures, update on milestone deadlines (Done) • May 2, 2007 – Lab Cleanup (Done) • May 3, 2007 – Open House (Done) • June 25-30, 2007 – Human Powered Submarine Competition (Bethesda, Maryland) (Incomplete) HPS Mechanical Lab III Milestones: • Design Prototype Manual Controls • May 1, 2007 – Dry test of manual system (Done) • June 20, 2007 – Pool testing of manual control system in MMA pool (Next Year) • Joystick Optimization • May 1,, 2007 – Dry Test Joystick and controls in Crosby Lab (Done) • June 20, 2007 – Pool Test Joystick and controls in the MMA pool (Next Year) • Auto-Pilot Optimization • On Hold for Next Year – Dry Test Autopilot with basic stamp (Delayed) • On Hold for Next Year – Determine if Autopilot useful for competition through pool testing (Delayed) • Human Powered Submarine Testing of Drag and Lift Generated by the Hull • April 19, 2007 – Tow Tank Testing Apparatus completely assembled for experiment (Done) • April 23, 2007 – Tow Tank Testing experiment complete using LabView software (Done) Home | Overview | Milestones | Photo | Video | Report | 2007-2008 | Contact Us | Links | Sponsors |