Background:This project was proposed by a group of interested students based on a summer internship. Applied Thermal Sciences in southern Maine is a technology oriented company that has been heavily involved in combustion and other engine technology for the Department of Defense and other customers. This work will focus on the development of a 2-stage rocket with hybrid boosters
|
|
Deliverables 1. Basic schematic of the design along with analysis of the propulsion and stability 2. Demonstration of the ability to safely and legally fly a level 3 rocket 3. Design data with verification of results from testing 4. Successful flight including atmospheric data 5. Rocket test stand |
|
Draft Milestones # Project Team Selection Complete: September 1, 2011 # First Revised Milestones Submitted: September 8, 2011 # Design Notebook Initial sign-off: September 13, 2011 # Initial model outline for the system: September 25, 2011 # System Schematic: October 2nd, 2011 # First web page goes live with introductory page and menu on left. Page must include resumes, individual photos and milestones: October 4, 2011, 4 pm. # Milestone review: October 25, 2011 # Draft Midterm Report: November 30th , 2011 # Midterm Report due as a PDF posted as a completed web page: December 8th, 5 pm # Tests data complete: March 15, 2012 # Lab Cleanup & Infrastructure Project Completed: Maine Day, April 25, 2012 # Open House -- Review of Projects, April 26, 2012, Afternoon # Final Web Page submitted, for review during final exam period: Monday May 3rd, 2012 Noon |