Phase I-Concept Initiation (
Literature Search
Cost
Ö
Comparison of cost
among different manufactures.
What’s
Currently Available.
Ö
Find different
manufactures that have such hardware.
What’s
Being Used
Ö
Decision as to what
hardware will be used for application.
Finalization
of Scope
Ö
Hardware necessary
for project will be determined. View input/output diagram
Concept Development
Meet with ECU group to coordinate hardware (
Specify
Sensors, DAQ, Software, Computer (
Ö
Pass in Parts
list/Specifications
Software
Learning and Testing (Simple Trial) (Measure Temperature)
Ö
Trial Data will be
handed in(
Basic
Design of Lab Cart (
Ö
Blueprint of concept
cart design will be turned in.
Basic
Setup of Complete DAQ System (May be some bugs) (
Attempt to have DAQ System Complete, Very Rough Outline
of Control System
·
Complete Data Report
(
Modified
Outline of Control System (Labview/Matlab Model) (
Working
Model of Control System (
Final
Design of Cart (Manufactured or Purchased to be determined) (
Ö
Blueprint of cart
will be provided
Completed
Control System (
Concept Assurance
Develop Basic Tests (
·
Decision as to what
tests and how the tests will be performed (outline handed in).
Testing
Completed (
·
Hand in data
confirming tests are accurate.
Manuals
Written (
·
Final drafts of
manuals handed in.
F.A.
Whenever presentations are
scheduled
Posters,
Power Point, etc.