Milestones for the Human Powered Vehicle:

SEMPTEMBER-DECEMBER

    Stongback

        Design/Build

    Plug

         Foam

         Gluing to Stongback

         Shaping Foam

JANUARY

    1/9/05    Epoxy Foam

    1/25/05  Apply Bondo to Plug

                 Devise small scale test to determine best way to release mold from plug

                 Test the small scale specimens and determine what method to use on plug

                 Prepare Plug Surface for Mold

                 Sand Plug

                 Wax Plug

                 Polish Plug

    1/29/05  Mold Design

    1/31/05  Shell Design/Composite Lay-up (write-up for paper too)  

 

FEBRUARY

       Roll Bar

                Design for Equivalency

                Written Equivalency Proof (for paper)

    2/4/05  Preliminary Entry Due!!!  (this means we must have the money!!)

        Mold

    2/3/05  Lay up

    2/3/05  Design Flange

    2/7/05  Take Apart/Construct Flange

    2/9/05  Seat (Design/Build)

    2/9/05  Shoes (height adjustment)

        Shell

                  Attachment Points

     2/10/05  Design/Prototype

     2/17/05  Test/Analysis

    2/18/05  Fabricate Attachment Points

                 Attach to shell (rear triangle)

                 Documentation for Inclusion in Paper

                 Fabricate Shell Parts

                 Assemble Shell Parts   

 

         Entire Front Sub-Frame Assembly

                      Compile List of stock bike-Parts (ongoing process, began in September)

                      Order Parts

                      Assemble Front Wheel

         Steering System

                            Design

                            Test Fit in Shell

                            Order Parts

                            Fabricate

                            Write-up for Paper

        Front Sub Frame

                Design

                Order Supplies

                Fabricate

                Write-up for Paper

                Fork (Build in Jig)

    2/25/05 All Paperwork Due!!!

MARCH

    3/21/05 Presentation Scheduling!!!

APRIL

    4/1/05  Assemble All Components

    4/8/05  Have HPV Operational

               Practice/Time Trials

               Troubleshooting

    4/10/05  Sponsorship Decals/ASME Logo/Race Number Layout!!!

    4/15/05  Allow Paint to Dry (1 week)

    4/22-24/05 Competition!!!

                           