Final Report
  • Measurements of current sled  (9/20/05)

Take measurements of current snowmobile, including attachment point locations for the engine, driveline, and other major components necessary.

 

  • Preliminary webpage design done (10/4/05)

 

  • Basic Chassis Design criteria and improvements  (10/18/05)
    • Baseline the current chassis.
    • Determine design aspects needed for the competition sled. 
    • Determine what improvements will be made over the stock chassis using House of Quality.
    • Justification for needed improvements to help sled compete



  • Complete Chassis design Sketches (11/01/05)

Create four basic design sketches for the chassis incorporating the improvements we have deemed necessary over stock chassis.  Basic line drawing showing frame and MAJOR pickup points

 

  • Completed solid model of chassis design  (01/24/05)

      Create a three dimensional chassis model using SolidWorks.

 

  • Determine idealized loading for competition sled  (11/30/05)

Analyze usage of sled in competition, determine dynamic and static loading of the snowmobile including separate forces exerted on the chassis by the engine suspension and other major components

 

  • Presentation of first semester results  (12/06/05)

 

  • Determine design loading   (01/24/06)

Using the idealized loading data, determine a safe design loading matrix

 

  • Proposal and milestones for Mechanical Lab 3 experiment (01/25/06)

 

  • Apply design loads to chassis   (02/01/06)

Utilizing the finite element method, apply loads and determine appropriate building materials and final chassis design, ie diameter and structure of tubing, bracing, and joint structure.

  •  Complete disassembly of existing Polaris snowmobile chassis (02/01/06)

 

  •  Design load frame and tunnel constraints (02/15/06)

 

  • Refine and reiterate design to maximize performance described by design criteria  (03/01/06)

 

  • Detailed drawing of all attachment points and components  (03/15/05)

                        Create a final drawing package for the fabrication of the chassis.

  •   Completed load frame and chassis fixture (03/15/06)

 

  •   Completed tunnel testing (03/29/06)

 

  • Final report outline complete  (04/01/06)

 

  • Final report completed  (04/18/06)
  •  Conclusions and final report completed (04/18/06)

 

  • Open house, operational review of project:   (05/04/06)

 

  • Final Project Report due  (05/10/06)

 

 