- Measurements of current sled (9/20/05)
Take
measurements of current snowmobile, including attachment point locations for
the engine, driveline, and other major components necessary.
- Preliminary webpage design done (10/4/05)
- Basic Chassis Design criteria and improvements (10/18/05)
- Baseline the current chassis.
- Determine design aspects
needed for the competition sled.
- Determine what improvements
will be made over the stock chassis using House of Quality.
- Justification for needed
improvements to help sled compete
- Complete Chassis design Sketches (11/01/05)
Create four
basic design sketches for the chassis incorporating the improvements we have
deemed necessary over stock chassis. Basic line drawing showing frame and
MAJOR pickup points
- Completed solid model of chassis design (01/24/05)
Create a three dimensional chassis model using SolidWorks.
- Determine idealized loading for competition sled (11/30/05)
Analyze
usage of sled in competition, determine dynamic and static loading of the
snowmobile including separate forces exerted on the chassis by the engine
suspension and other major components
- Presentation of first semester results (12/06/05)
- Determine design loading (01/24/06)
Using the
idealized loading data, determine a safe design loading matrix
- Proposal and milestones for Mechanical Lab 3 experiment (01/25/06)
- Apply design loads to chassis (02/01/06)
Utilizing
the finite element method, apply loads and determine appropriate building
materials and final chassis design, ie diameter and structure of tubing,
bracing, and joint structure.
- Complete disassembly of existing Polaris
snowmobile chassis (02/01/06)
- Design load frame and
tunnel constraints (02/15/06)
- Refine and reiterate design to maximize performance described by
design criteria (03/01/06)
- Detailed drawing of all attachment points and components (03/15/05)
Create a final drawing package for
the fabrication of the chassis.
- Completed load frame and chassis
fixture (03/15/06)
- Completed tunnel testing (03/29/06)
- Final report outline complete (04/01/06)
- Final report completed (04/18/06)
- Conclusions and final report completed (04/18/06)
- Open house, operational review of project: (05/04/06)
- Final Project Report due (05/10/06)
|