2005-2006
Piggyback ECU

Milestones
9/16/05 Meet with last year's team and read all their materials 9/13/05
9/20/05 Research Data Logger 9/20/05
9/22/05 Take all safety tests and check out tools from Art. Also review 2010 emission standards. 9/20/05
9/23/05 Help the Noise and Vibration group get track Dyno up and running.. 9/27/05
9/27/05 Meet with last years group to go over basic stamp and wiring 9/27/05
9/29/05 Order data logger. 9/27/05
10/04/05 Attach data logger to the sled and get up and running. Almost 10/18
Due to late arrival
10/04/05 Post team webpage. 10/4/05
10/16/05 Written test plans and control parameters. 10/25/05
10/25/05 Figure out exhaust gas analyzer 10/25/05
11/01/05 First layout of basic stamp 11/1/05
11/01/05 Execute test plans. 11/1/05
11/15/05 Compare test results to that of last year’s team. 11/7/05 Tested A/F
Ratio, NO Calibration
Gas for emissions
11/21/05 Construction of first basic stamp controller complete and documentation of piggyback design version 1. 11/21/05
12/01/05 Comparison of piggyback controller with and without additional inputs, including throttle positions sensor. 12/1/05
12/20/05 Complete and hand in Midterm report. 12/20/05
12/20/05 Modify Website for this term 12/20/05
SPRING SEMESTER MILESTONES
1/17/06 Evaluation of idle air mixture for meeting 2012 emissions standards. 11/1/05
1/24/06 Complete of speedometer input 1/24/06
2/2/06 Completion of new piggyback on bread board 2/2/06
2/7/06 Connect new piggyback to sled 2/7/06
2/9/06 Test new piggyback to last years emissions (Lab) 2/9/06
2/18/06 Test new piggyback to minimize emissions (Lab) 2/18/06
2/28/06 Complete new box and finish mount for Datalogger 2/28/06
3/03/06 Final equipment tested and installed on competition sled. 3/03/06
3/13/06 CSC Competition 3/13/06
5/03/06 Set up of projects for final review, Maine Day. 4/26/06
5/04/06 Open house, operational review of project. 4/27/06
5/10/06 Final Project Report due. 5/5/06