Milestones
- Function of
the design: September 29, 2005
-
- Scope of the design: October 6, 2005
-
- Efficiency/sustainability/green requirements or
goals
- Feasibility/Design of grey water heat recovery
system: October 27, 2005
-
- Research on existing products
- Determination of hot water load
- If this heat recovery system is feasible we will
give design of possible ways to implement, the final design will have
to wait to be selected once the entire building has been designed
-
- Report: Selection of electrical appliances and
components: November 17, 2005
-
- Presentation of first semester results: December 6,
2005
- Report: Determination of electrical load: December
15, 2005
-
- How much electricity will be needed by the entire
complex on a daily, monthly, and yearly basis
- Redefine objective, function and scope of the design: December 20,2005
-
- General report of existing energy efficient
construction: January 26, 2006
-
- Report: Design of space heating/cooling and general
layout: March 23, 2006
-
- Determination of space heating load
- Design of passive solar system
- Design of passive cooling system
- Determination of secondary heating source
- Design of ventilation system
- Report: Design of photovoltaic system: April 6, 2006
-
- Select photovoltaic panels: number required,
size, location/attachment
- Includes any relevant CAD drawings or pictorials
needed for installation
- Complete interactive website: April 20, 2006
- Complete green loan fund project webpages for next year's senior projects : April 27, 2006
- Present green loan fund project ideas to students, faculty and student government: May 1-5, 2006
|