Fabrication & Assembly

MET SENIOR DESIGN - BLACK TEAM

Maine Engineering Technology

Jon adjusting the draft fan during preliminary test

Dan & Jon working on fan during first

test run

Black teams first test fire!!!!

Boiling water after 25 minutes!

Final Product ready for plumbing & electrical!

Another view of stove

Complete with Plumbing & Electrical

Opposite side w/standpipe

Front View of completed unit

Taco Circulator pump and fill/drain valve

Tank hookups and shutoff valves

Back of stove

Power cord and electrical control panel

Stove hooked to tank for test burn

Prof. Morrison setting up Data Acquisition software for test

Discussing increasing excess air inlet

hole size

Isaac adjusting damper on front door

View of pump and controls

View of stove ready to burn

Black team stove making hot water!!

Black Team’s First Instrumented Test Burn

Black Team’s Second Instrumented Test Burn

Isaac watching the draft fan

Ben and Josh watching the DAQ

Dan, Ben, Isaac and Josh with the stove

Josh running the DAQ controls

Ben, Josh and Dan talking about the test

Getting the stove and tank set up for test

Loading the wood in for the test