Fabrication & Assembly |
MET SENIOR DESIGN - BLACK TEAM |
Maine Engineering Technology |
Jon adjusting the draft fan during preliminary test |
Dan & Jon working on fan during first test run |
Black teams first test fire!!!! |
Boiling water after 25 minutes! |
Final Product ready for plumbing & electrical! |
Another view of stove |
Complete with Plumbing & Electrical |
Opposite side w/standpipe |
Front View of completed unit |
Taco Circulator pump and fill/drain valve |
Tank hookups and shutoff valves |
Back of stove |
Power cord and electrical control panel |
Stove hooked to tank for test burn |
Prof. Morrison setting up Data Acquisition software for test |
Discussing increasing excess air inlet hole size |
Isaac adjusting damper on front door |
View of pump and controls |
View of stove ready to burn |
Black team stove making hot water!! |
Black Team’s First Instrumented Test Burn |
Black Team’s Second Instrumented Test Burn |
Isaac watching the draft fan |
Ben and Josh watching the DAQ |
Dan, Ben, Isaac and Josh with the stove |
Josh running the DAQ controls |
Ben, Josh and Dan talking about the test |
Getting the stove and tank set up for test |
Loading the wood in for the test |