Advertisements
Current Projects (updated 04/06/13)
Request for Designer:
None
at this time.
Request for
Construction Contractor:
ESTABROOKE HALL RENOVATIONS
The Project consists of the renovation
of the first floor and a portion of the second floor of Estabrooke
Hall to create classroom and office space.
Filed Sub-Bids will be required for electrical, HVAC and plumbing
trades and there are bid alternate items for this Project.
A non-mandatory pre-bid walk-through
will be held at Estabrooke Hall, University of
Maine on Thursday, April 18, 2013 at 11:00am. The walk-through will begin at the back
entrance of Estabrooke Hall.
Filed Sub-Bids must be
received at the Bid Depository prior to 3:00pm on Tuesday, April
30, 2013. General Contractor
Bids must be received at Facilities Management prior to 3:00pm on Tuesday, May 7, 2013.
SPECS AND DRAWINGS WILL
BE POSTED WEDNESDAY, APRIL 10, 2013.
Click here for more information. (link not
currently active)
___________________________________________________________________
KENNEBEC
& AROOSTOOK BUILDING INTERIOR PAINT
The Project consists of painting the
dormitory rooms, excluding the RD apartments, in Kennebec Hall and
Aroostook Hall.
No pre-bid meeting is scheduled for
this project.
Bids must be received in Facilities
Management prior to 3:00pm
on Tuesday,
April
30, 2013.
SPECS AND DRAWINGS WILL
BE POSTED MONDAY, APRIL 8, 2013.
Click here for more information.
___________________________________________________________________
WALLACE
POOL REROOFING
The Project consists of removing the
existing EPDM and T&G
roof system to the vapor barrier and the installation of a fully adhered
insulated PVC roofing system.
No pre-bid meeting is scheduled for
this project.
Bids must be received in Facilities
Management prior to 2:30pm
on Tuesday,
April
30, 2013.
SPECS AND DRAWINGS WILL
BE POSTED MONDAY, APRIL 8, 2013.
Click
here for more information.
___________________________________________________________________
PICS (KEYO)
REROOFING
The Project consists of removing the
existing T&G roof system to the vapor barrier
and the installation of a fully adhered insulated PVC roofing system.
No pre-bid meeting is scheduled for
this project.
Bids must be received in Facilities
Management prior to 2:00pm
on Tuesday,
April
30, 2013.
SPECS AND DRAWINGS WILL
BE POSTED MONDAY, APRIL 8, 2013.
Click
here for more information.
___________________________________________________________________
MUNSON
ROAD REHABILITATION PHASE III
The Project consists of the
rehabilitation of approximately 550 lf of existing bituminous roadway at
the University of Maine on Munson Road.
The Work commencement date shall be no earlier than May 13, 2013. Work will be performed adjacent to
occupied buildings and the roadway may be closed through coordination with
Owner.
No pre-bid meeting is scheduled for
this project.
Bids must be received at Facilities
Management prior to 2:00pm
on Monday,
April
22, 2013.
Click
here for more information.
___________________________________________________________________
CROSBY
LAB ELEVATOR & ADA BATHROOM
The Project consists of the
installation of a new two-stop hydraulic elevator within the existing
building and renovation of an existing restroom to make ADA accessible.
A non-mandatory pre-bid meeting
will be held in the main lobby of Crosby Laboratory at the University of
Maine, Orono, Maine on Tuesday, April 9, 2013
at 9:00am.
Bids must be received at Facilities
Management prior to 2:00pm
on Tuesday,
April
16, 2013.
Click
here for more information.
___________________________________________________________________
TRACK
MATERIAL REMOVAL
The Project consists of the removal of
approximately 53,200sf of rubberized indoor track surface material from the
Field House at the University of Maine, Orono,
Maine. Environmental analysis has
identified detectable concentrations of mercury and the material must be
managed for removal and disposal as a hazardous debris regulated under 40 CFR 268.45. A Bid Alternate applies to this project.
A non-mandatory pre-bid meeting
will be held at the westerly entrance of the Field House on Thursday,
March 21, 2013 at 10:00am.
Bids must be received at Facilities
Management prior to 2:00pm
on Monday,
April
8, 2013.
Click
here for more information
ADDENDUM 1, dated March 19, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
1
ADDENDUM 2, dated March 25, 2013, has been added to the
Proposal Documents. This Addendum
contains the list of pre-bid meeting attendees. Please refer to the following link to
access the Addendum: Addendum
2
Other Requests:
None
at this time.
|