Advertisements
Current Projects (updated 05/24/13)
Request for Designer:
None
at this time.
Request for
Construction Contractor:
ALUMNI
HALL EXTERIOR RESTORATION
The Project consists of replacing the
south side fascia, soffit and trim detail as shown on plans, and the
painting of all exterior windows, doors, frames and screens of Alumni
Hall. There is a bid alternate for
this Project.
There will be no pre-bid meeting.
Bids must be received in Facilities
Management prior to 2:00pm
on Tuesday,
June
4, 2013.
Click here for more information.
ADDENDUM 1, dated May 24, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
1
Other Requests:
PAVING
MAINTENANCE FY14
The
Project consists of placing overlay pavement on existing paved campus
roads, parking lots and sidewalks.
Locations will be selected based on total tonnage to be placed,
which quantity may vary based on the unit prices received. Associated miscellaneous items including
shim pavement, bituminous curb and adjusting structures to grade will be
done as necessary.
There
will be no pre-bid meeting.
Bids
must be received in Facilities Management prior to 2:00pm on Tuesday,
June 11, 2013.
Click here for more information.
ADDENDUM
1,
dated May 24, 2013, has been added to the Proposal Documents. Please note this Addendum includes the 00
73 46 Wage Determination Schedule. Please
refer to the following link to access the Addendum: Addendum
1
___________________________________________________________________
ORONO BOG WALK
The Project, located in the City of
Bangor, consists of the replacement of approximately 880 linear feet of the
existing dock type floating sections of marsh boardwalk constructed
primarily of rough sawn hemlock.
This is the first phase of a larger project to replace the entire
4,971 linear foot boardwalk. The new
walkway structure will meet all code compliance and ADA requirements of the
Federal and State governments.
A non-mandatory pre-bid meeting
will be held at the site located within the Bangor City Forest on Tripp
Drive off Stillwater Avenue in Bangor, Maine, on Thursday, April 25,
2013 at 10:00am.
Bids must be received in Facilities
Management prior to 2:00pm
on Thursday,
May
9, 2013.
UPDATE: THE SPECIFICATIONS AND DRAWINGS FOR THIS PROJECT HAVE
BEEN POSTED.
Click here
for more information.
ADDENDUM 1, dated April 26, 2013, has been added to the
Proposal Documents. This Addendum revises the:
1. Non-mandatory
pre-bid meeting date to Thursday, May 9, 2013 at 10:00am
2. BID OPENING
date to 2:00pm on Thursday, May 30, 2013.
Please refer to the following link to
access the Addendum: Addendum
1
ADDENDUM 2, dated April 29, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
2
ADDENDUM 3, dated May 17, 2013, has been added to the
Proposal Documents. Please refer to
the following link to access the Addendum:
Addendum
3
|