July 20, 2010

Calendar  |  Campus Map  | 

About UMaine | Student Resources | Prospective Students | Faculty & Staff | Alumni | Arts | News | Parents | Research

The University of Maine, Office of Facilities Management



 

 

Designers & Contractors

Advertisements

Current Projects (updated 04/06/13)

 

Request for Designer:

 

None at this time.

 

 

Request for Construction Contractor:

 

ESTABROOKE HALL RENOVATIONS

 

The Project consists of the renovation of the first floor and a portion of the second floor of Estabrooke Hall to create classroom and office space.  Filed Sub-Bids will be required for electrical, HVAC and plumbing trades and there are bid alternate items for this Project.

 

A non-mandatory pre-bid walk-through will be held at Estabrooke Hall, University of Maine on Thursday, April 18, 2013 at 11:00am.  The walk-through will begin at the back entrance of Estabrooke Hall.

 

Filed Sub-Bids must be received at the Bid Depository prior to 3:00pm on Tuesday, April 30, 2013.  General Contractor Bids must be received at Facilities Management prior to 3:00pm on Tuesday, May 7, 2013.

 

SPECS AND DRAWINGS WILL BE POSTED WEDNESDAY, APRIL 10, 2013.

 

Click here for more information. (link not currently active)

 

___________________________________________________________________

KENNEBEC & AROOSTOOK BUILDING INTERIOR PAINT

 

The Project consists of painting the dormitory rooms, excluding the RD apartments, in Kennebec Hall and Aroostook Hall.

 

No pre-bid meeting is scheduled for this project.

 

Bids must be received in Facilities Management prior to 3:00pm on Tuesday,

April 30, 2013.

 

SPECS AND DRAWINGS WILL BE POSTED MONDAY, APRIL 8, 2013.

 

Click here for more information.

 

___________________________________________________________________

WALLACE POOL REROOFING

 

The Project consists of removing the existing EPDM and T&G roof system to the vapor barrier and the installation of a fully adhered insulated PVC roofing system.

 

No pre-bid meeting is scheduled for this project.

 

Bids must be received in Facilities Management prior to 2:30pm on Tuesday,

April 30, 2013.

 

SPECS AND DRAWINGS WILL BE POSTED MONDAY, APRIL 8, 2013.

 

Click here for more information.

 

___________________________________________________________________

PICS (KEYO) REROOFING

 

The Project consists of removing the existing T&G roof system to the vapor barrier and the installation of a fully adhered insulated PVC roofing system.

 

No pre-bid meeting is scheduled for this project.

 

Bids must be received in Facilities Management prior to 2:00pm on Tuesday,

April 30, 2013.

 

SPECS AND DRAWINGS WILL BE POSTED MONDAY, APRIL 8, 2013.

 

Click here for more information.

 

___________________________________________________________________

MUNSON ROAD REHABILITATION PHASE III

 

The Project consists of the rehabilitation of approximately 550 lf of existing bituminous roadway at the University of Maine on Munson Road.  The Work commencement date shall be no earlier than May 13, 2013.  Work will be performed adjacent to occupied buildings and the roadway may be closed through coordination with Owner.

 

No pre-bid meeting is scheduled for this project.

 

Bids must be received at Facilities Management prior to 2:00pm on Monday,

April 22, 2013.

 

Click here for more information.

 

___________________________________________________________________

CROSBY LAB ELEVATOR & ADA BATHROOM

 

The Project consists of the installation of a new two-stop hydraulic elevator within the existing building and renovation of an existing restroom to make ADA accessible.

 

A non-mandatory pre-bid meeting will be held in the main lobby of Crosby Laboratory at the University of Maine, Orono, Maine on Tuesday, April 9, 2013 at 9:00am.

 

Bids must be received at Facilities Management prior to 2:00pm on Tuesday,

April 16, 2013.

 

Click here for more information.

 

___________________________________________________________________

TRACK MATERIAL REMOVAL

 

The Project consists of the removal of approximately 53,200sf of rubberized indoor track surface material from the Field House at the University of Maine, Orono, Maine.  Environmental analysis has identified detectable concentrations of mercury and the material must be managed for removal and disposal as a hazardous debris regulated under 40 CFR 268.45.  A Bid Alternate applies to this project.

 

A non-mandatory pre-bid meeting will be held at the westerly entrance of the Field House on Thursday, March 21, 2013 at 10:00am.

 

Bids must be received at Facilities Management prior to 2:00pm on Monday,

April 8, 2013.

 

Click here for more information

 

ADDENDUM 1, dated March 19, 2013, has been added to the Proposal Documents.  Please refer to the following link to access the Addendum:  Addendum 1

 

ADDENDUM 2, dated March 25, 2013, has been added to the Proposal Documents.  This Addendum contains the list of pre-bid meeting attendees.  Please refer to the following link to access the Addendum:  Addendum 2

 

 

Other Requests:

 

None at this time.

 

 

 

Office of Facilities Management

The University of Maine, Orono, ME 04469