REQUEST FOR PROPOSAL #36-03                                                                   January 16, 2003

 

 

Administered by

PURCHASING DEPARTMENT

UNIVERSITY OF MAINE

ORONO, MAINE 04469-5765

 

REQUEST FOR PROPOSAL FOR ELEVATOR SERVICES AT USM

 

 

1.0     GENERAL INFORMATION:                             

 

         1.1     Purpose: The University of Maine System, acting through The University of Southern Maine (USM), is seeking proposals for the provision of elevator inspection, repair and maintenance services at its Portland, Gorham and Lewiston-Auburn campuses.

 

      This Request for Proposals (RFP) states the instructions for submitting proposals, the procedure and criteria by which a vendor may be selected and the contractual terms by which the University intends to govern the relationship between it and the selected vendor. 

 

         1.2     Definition of Parties: The University of Southern Maine will hereinafter be referred to as the "University."  Respondents to the RFP shall be referred to as "Bidders."  The Bidder to whom the contract is awarded shall be referred to as the "Contractor."

 

         1.3     Scope: The Contractor shall furnish complete inspection, preventive maintenance, incidental servicing, minor repair, emergency service, and all parts for elevators.  Services shall include, but not be limited to, the provision of qualified labor; supervision; transportation (when and where required); establishment and maintenance of records; all parts, tools, equipment, and cleaning.  Maintenance records shall include repair work performed and spare parts used.  All work performed shall be patterned after accepted commercial practices for elevator maintenance contracts.  The frequency of inspection and service shall be consistent with the requirements of the equipment, and shall be established so the reliability and proper operation characteristics of the elevators are not degraded.

      

         1.4     Evaluation Criteria: Proposals will be evaluated on many criteria deemed to be in the University's best interests, including, but not limited to: 

 

Experience – of the bidder’s firm

Performance on previous and present contracts

Qualifications of the technicians to be assigned to this contract

Cost

Emergency Service

Service and Parts support

Plan to maintain elevators

Responsiveness to the RFP

References

Financial stability of company

         

         1.5     Communication with the University:  It is the responsibility of the bidder to inquire about any requirement of this RFP that is not understood.  Responses to inquiries, if they change or clarify the RFP in a substantial manner, will be forwarded by addenda to all parties that have received a copy of the RFP.  Addenda will also be posted on our web site, www.umaine.edu/purchasing/.  The University will not be bound by oral responses to inquiries or written responses other than addenda.

                  Inquiries must be made to:    Hal Wells

            Purchasing Department Room 101J

            University of Maine

            5765 Service Building

            Orono, Maine 04469-5765

            (207) 581-2708

 

         1.6     Award of Proposal: Presentations may be requested of two or more bidders deemed by the University to be the best suited among those submitting proposals on the basis of the selection criteria.  After presentations have been conducted, the University may select the bidder which, in its opinion, has made the proposal that is the most responsive and most responsible and may award the contract to that bidder.   The University reserves the right to inspect the bidder’s facilities prior to the contract award.  The University reserves the right to waive minor irregularities.  Scholarships, donations, or gifts to the University will not be considered in the evaluation of proposals.  The University may cancel this Request for Proposal or reject any or all proposals in whole or in part.  Should the University determine in its sole discretion that only one bidder is fully qualified, or that one bidder is clearly more qualified than any other under consideration, a contract may be awarded to that bidder without further action.

 

         1.7     Award Protest:  Bidders may appeal the award decision by submitting a written protest to the Director of Purchasing within five (5) business days of the award notice, with a copy of the protest to the successful bidder.  The protest must contain a statement of the basis for the challenge.

 

         1.8     Confidentiality: The information contained in proposals submitted for the University's consideration will be held in confidence until all evaluations are concluded and an award has been made.  At that time, the winning proposal will be available for public inspection.  Pricing and other information that is an integral part of the offer cannot be considered confidential after an award has been made.  The University will honor requests for confidentiality for information of a proprietary nature.  Clearly mark any information considered confidential.

 

         1.9     Costs of Preparation: Bidder assumes all costs of preparation of the proposal and any presentations necessary to the proposal process.

 

         1.10   Debarment: Submission of a signed proposal in response to this solicitation is certification that your firm (or any subcontractor) is not currently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from participation in this transaction by any State or Federal department or agency.  Submission is also agreement that the University will be notified of any change in this status.

 

         1.11   Proposal Understanding: By submitting a proposal, the bidder agrees and assures that the specifications are adequate, and the bidder accepts the terms and conditions herein.  Any exceptions should be noted in your response.

 

         1.12   Proposal Validity: Unless specified otherwise, all proposals shall be valid for 60 days from the due date of the proposal.

 

         1.13   Proposal Submission:  A SIGNED original and three (3) copies of the proposal must be submitted to the University of Maine Purchasing Department, 5765 Service Building, Orono, Maine 04469-5765, in a sealed envelope by Wednesday, February 19, 2003, to be date stamped by the Purchasing Department in order to be considered.  Normal business hours are 8:00 a.m. to 4:30 p.m., Monday through Friday.  Proposals received after the due date will be returned unopened.  There will be no public opening of proposals (see Confidentiality clause).  Vendors are strongly encouraged to submit proposals in advance of the due date to avoid the possibility of missing the due date because of unforeseen circumstances.  Vendors assume the risk of the methods of dispatch chosen.  The University assumes no responsibility for delays caused by any package or mail delivery service.  Postmarking by the due date WILL NOT substitute for receipt of proposal.  In the event that the University is closed due to inclement weather on the day that a proposal is due, proposals will be accepted on the next day that the University is open. Vendors may wish to call 207-581-SNOW or 800-581-SNOW if the weather is bad, to learn if the University has closed.  Additional time will not be granted to any single vendor, however, additional time may be granted to all vendors when the University determines that circumstances require it.  FAXED OR E-MAIL PROPOSALS WILL NOT BE ACCEPTED.  The envelope must be clearly identified on the outside as follows:

 

Name of Bidder

Address of Bidder

Due Date

RFP #   

 

         1.14   Pre-Proposal Conference: A pre-proposal conference and tour will be held on Tuesday, February 4, 2003 at 9:00 a.m. local time at the USM Office of Facilities Management, 25 Bedford Street, Portland, Maine.  The purpose of this conference is to answer questions, provide further clarification as may be required and tour the affected facilities.  Please hold all questions until this meeting.  Attendance by all prospective bidders is mandatory.

 

                  Firms planning to attend this pre-proposal conference should contact Cindy Carusi at 207-581-2696 no later than 4:00 p.m. local time on Friday, January 31, 2003, with the names and titles of the individuals who will attend.

 

 

2.0     GENERAL TERMS AND CONDITIONS:  

 

         2.1     Contract Documents: If a separate contract is not written, the contract entered into by the parties shall consist of the Request for Proposal, the signed proposal submitted by the Contractor, the specifications including all modifications thereof, and a purchase order or letter of agreement requiring signatures of the University and the Contractor, all of which shall be referred to collectively as the Contract Documents.

 

         2.2     Contract Modification and Amendment: The parties may adjust the specific terms of this contract (except for pricing) where circumstances beyond the control of either party require modification or amendment.  Any modification or amendment proposed by the Contractor must be in writing to the Purchasing Department.  Any agreed upon modification or amendment must be in writing and signed by both parties.

 

         2.3     Contract Term: The contract term shall be for a period of approximately three (3) years commencing upon March 1, 2003, or as soon as possible thereafter, and concluding on December 31, 2006.  With mutual written agreement of the parties this contract may be extended for two (2) additional one-year periods through December 31, 2008.  Contract cost adjustments will be considered for each additional one-year extension of the contract.  Terms and conditions, which relate to indemnification and other related matters, shall continue in effect for one (1) year after the ending date of this agreement.

 

         2.4     Contract Data: The Contractor is required to provide the University with detailed data concerning the contract at the completion of each contract year or at the request of the University at other times.  The University reserves the right to audit the Contractor's records to verify the data.  This data may include, but is not limited to, items sold or services rendered to the University.

 

         2.5     Contract Validity: In the event one or more clauses of the contract are declared invalid, void, unenforceable or illegal, that shall not affect the validity of the remaining portions of the contract.

 

         2.6     Cancellation/Termination: If the Contractor defaults in its agreement to provide personnel or equipment to the University's satisfaction, or in any other way fails to provide service in accordance with the contract terms, the University shall promptly notify the Contractor of such default and if adequate correction is not made within seven (7) days, the University may take whatever action it deems necessary to provide alternate services and may, at its option, immediately cancel this Contract with written notice.  Cancellation does not release the Contractor from its obligation to provide goods or services per the terms of the contract during the notification period.

 

         2.7     Clarification of Responsibilities: Whenever a conflict, contradiction, or discrepancy exists between any statutes, regulations, plans or specifications, or if the Contractor requests clarification of or deviation from terms of the contract, it is the Contractor's responsibility to obtain the written clarification from the University (see Section 2.20).

 

         2.8     Litigation: This Contract and the rights and obligations of the parties hereunder shall be governed by and construed in accordance with the laws of the State of Maine.  The Contractor agrees that any litigation, action or proceeding arising out of this Contract shall be instituted in a state court located in the State of Maine.

 

         2.9     Assignment: Neither party of the contract shall assign the contract without the prior written consent of the other, nor shall the contractor assign any money due or to become due without the prior written consent of the University.

 

         2.10  Equal Opportunity: In the execution of the contract, the Contractor and all subcontractors agree, consistent with University of Maine System policy, not to discriminate on the grounds of race, color, religion, sex, sexual orientation, national origin or citizenship status, age, disability or veteran’s status and to provide reasonable accommodations to qualified individuals with disabilities upon request.

 

         2.11   Independent Contractor: Whether the Contractor is a corporation, partnership, other legal entity, or an individual, the Contractor is an independent contractor.  If the Contractor is an individual, the Contractor's duties will be performed with the understanding that the Contractor is a self-employed person, has special expertise as to the services which the Contractor is to perform and is customarily engaged in the independent performance of the same or similar services for others.  The manner in which the services are performed shall be controlled by the Contractor; however, the nature of the services and the results to be achieved shall be specified by the University.  The Contractor is not to be deemed an employee or agent of the University and has no authority to make any binding commitments or obligations on behalf of the University except as expressly provided herein.  The University of Maine System has prepared specific guidelines to be used for contractual agreements with individuals (not corporations or partnerships) who are not considered employees of the System.

 

         2.12  Sexual Harassment: The University is committed to providing a positive environment for all students and staff.  Sexual harassment, whether intentional or not, undermines the quality of this educational and working climate.  The University thus has a legal and ethical responsibility to ensure that all students and employees can learn and work in an environment free of sexual harassment.  Consistent with the state and federal law, this right to freedom from sexual harassment was defined as University policy by the Board of Trustees.

 

 

 

                  Failure to comply with this policy could result in termination of this contract without advanced notice.  Further information regarding this policy is available from the Executive Director for Campus Pluralism and Equal Opportunity, 780-5094.

 

         2.13   Indemnification: The Contractor agrees to be responsible for, and to protect, save harmless, and indemnify the University from and against all loss, damage, cost and expense (including attorney's fees) suffered or sustained by the University or for which the University may be held or become liable by reason of injury (including death) to persons or property or other causes whatsoever, in connection with the operations of the Contractor or any subcontractor under this agreement.

 

         2.14   Contractor's Liability Insurance: During the term of this agreement, the Contractor shall maintain the following insurance:

 

            Insurance Type                                Coverage Limit

 

      1.  Commercial General Liability                    $1,000,000 per occurrence or more

                                                                        $2,000,000 aggregate or more

                                                                                               (Bodily Injury and Property Damage)

 

      2.  Automobile Liability                                 $1,000,000 per occurrence or more

                      (Including Hired & Non-Owned)                     (Bodily Injury and Property Damage)

 

      3.  Workers Compensation                           Required for all personnel

           Employers Liability minimum limits:

                  Bodily injury by accident:                  $100,000 each accident

                  Bodily injury by disease:                   $100,000 each employee     

                  Bodily injury by disease:                   $500,000 policy limit     

 

                  The University of Maine System shall be named as Additional Insured on the Commercial General Liability insurance.

 

                  Certificates of Insurance for all of the above insurance shall be filed with:

 

University of Maine Purchasing Department

5765 Service Building

Orono, Maine 04469-5765

 

                  Certificates shall be filed prior to the date of performance under this Agreement.  Said certificates, in addition to proof of coverage, shall contain the standard statement pertaining to written notification in the event of cancellation, with a thirty (30) day notification period.

 

                  As additional insured and certificate holder, the University should be included as follows:

 

The University of Maine System

Office of Facilities

107 Maine Avenue

Bangor, ME 04401

 

         2.15  Smoking Policy: The University of Maine System must comply with the "Work Place Smoking Act of 1985" and MRSA title 22, 1541 et seq "Smoking Prohibited in Public Places." In compliance with this law, the University of Maine System has prohibited smoking in all University System buildings except in designated smoking areas.  This rule must also apply to all contractors and workers in existing University System buildings.  The Contractor shall be

 

                  responsible for the implementation and enforcement of this requirement within existing buildings.

 

  2.16    Parking Regulations and Use of Walkways: The Contractor's vehicles and those of their employees working on campus must be registered with the Department of Public Safety.  Unregistered vehicles on the University campus are subject to a parking violation ticket and/or towing off campus.  Contractors are advised that parking regulations are strictly enforced by campus police.  Towing will be at the Contractor's expense.  A copy of regulations can be obtained by calling Public Safety Parking Office at 780-5211.  Driving on walkways is not allowed.  However, exceptions can be requested from the Contract Administrator on an “as needed” basis.

 

  2.17    Additions/Deletions: The University retains the option to add or delete elevators on the contract at rates mutually agreed upon, consistent with bid prices, after warranty services have been fulfilled.  Additions or deletions can only be by written amendment to the contract.  The Contractor shall inspect new elevators prior to warranty expiration and advise the Facilities Office of any maintenance related areas needing attention.  The University will insure new elevators are in proper operating condition prior to the expiration of the warranty.

 

         2.18   Job Site Safety:  The Contractor shall adhere to the Occupational Safety and Health Administration's (OSHA's) most recently published Safety and Health Regulations for Construction (29 CFR 1926) and general Occupational Safety and Health Standards (29 CFR 1910) for the duration of this contract.  The Contractor shall, before the first application for payment, submit to the Department of Environmental Safety two copies (one for forwarding to the University of Maine System) of the Contractor's written Hazard Communication Program.  Additionally, if the Contractor will be using electrical circuits that are not part of a building or structure and not equipped with ground fault interrupt systems, two copies of the Contractor's written Assured Equipment Grounding Conductor Program shall also be submitted to the Department of Environmental Safety (207-780-5406) before the first application for payment.

 

                  Prior to the commencement of any phase of work under this contract, the Contractor will submit the name(s) of the person(s) who is (are) designated as being responsible for job site safety under this contract and is (are) familiar with the above-referenced OSHA regulations.

 

                  Where any of the Contractor's operations occur in, on, or within 50 feet of any door, window, air intake in a building occupied by University employees or students, the Contractor shall, prior to the start of any operation, provide directly to the University's representative, copies of the Material Safety Data Sheets (not previously submitted with Hazard Communication Program, required in Paragraph 1 of  this article) on all materials to be used in the operation that may be classified as hazardous under the Maine Chemical Substance Identification Law (MRSA P1709 through P1712).

 

         2.19   Solid Waste Removal:  The Contractor will be responsible for cleaning up all litter from spaces assigned and shall promptly remove all waste materials created by the Contractor's operation from University premises by the end of the day.  The Contractor shall make every effort to promote waste reduction and recycling and follow University policies to reduce, reuse, and recycle.  Complete information about University policies can be obtained by calling the Waste Management Office at 780-4160.

 

         2.20   Notification and Response:  The Contractor must be responsive to the needs of the University and shall coordinate activities under this contract with the University Office of Facilities Management (USM) and the Purchasing Department (Orono).  The Contractor shall promptly respond to reasonable requests and recommendations.

 

 

                  Department of Facilities Management:

 

                        Portland, Gorham, and Lewiston-Auburn

                        Raymond Bland – Contract Administrator

                        Assistant Director of Maintenance - Portland

                        Department of Facilities Management

                        96 Falmouth Street

                        Portland, Maine   04103-4899

 

         2.21   Asbestos Removal:  The University shall be responsible for the removal of all asbestos containing materials (ACM).  The Contractor is responsible for performing very basic visual assessments of all projects and maintenance work sites for suspected hazardous materials (materials not labeled) prior to commencing work.  Where such materials are located, they stop work and communicate the need for material identification to the University Project Coordinator.  The University Project Coordinator will then contact the Asbestos and Lead Coordinator who facilitates testing and identification of the material, completes Abatement Notifications, where applicable, and reports results of tests and/or abatement schedules to the University Project Coordinator who will then direct the Contractor.

 

         2.22   Lockout and Tagout of Electrical Equipment:  The Contractor shall establish methods of insuring employee safety as well as compliance with Federal, State, University and local regulations relating to the lockout and tagout of electrical equipment procedures.  Further information on this policy can be obtained by calling the USM Office of Occupational Safety & Health.

 

         2.23   Confined Space Policy:  The Contractor shall establish methods of insuring employee safety as well as compliance with Federal, State, University, and Local regulations relating to Confined Space and the entry thereof.  The Contractor shall furnish its latest version of Confined Space procedures to the University prior to the contract award.  Under the University’s confined space policy, elevator pits are defined as confined space.  Further information on this policy can be obtained by calling the office of USM Facilities Management.

 

         2.24   Access to buildings:  Keys, for access to buildings are available through the Department of Facilities Management, 25 Bedford Street, Portland.  After hours, or in the event of an emergency, keys are available from University Police.

 

        

3.0     PERFORMANCE TERMS AND CONDITIONS:

 

         3.1     Contract Administration:  The University of Southern Maine’s Department of Facilities Management shall be the University's authorized representative in all matters pertaining to the administration of this contract.

 

         3.2     Employees:  The Contractor shall employ only competent and satisfactory personnel and shall provide a sufficient number of employees to perform the required services efficiently and in a manner satisfactory to the University.  If the Contract Administrator or designee, notifies the Contractor in writing that any person employed on this contract is incompetent, disorderly, or otherwise unsatisfactory, such person shall not again be employed in the execution of this contract without the written consent of the Contract Administrator.

 

         3.3     Payments:  Payment will processed be upon submittal of a monthly invoice to the Department of Facilities Management by the Contractor on a net 30 (calendar day) basis unless discount terms are offered.  Elevator service will be invoiced at the end of the month for which service is performed.  Performance of work not included in the contract must be pre-approved by the

 

                  Contract Administrator.  Invoicing for work claimed “not in contract” will be complete, citing reasons for charges and will be supported by time slips signed by the Contract Administrator. 

 

         3.4     Records:  The Contractor shall provide, and keep current, a check chart suitable for each elevator, to indicate the status of all scheduled maintenance work performed and the date of performance.  The chart shall be posted in the machine room or other location convenient to each station.  The Contractor must initial the chart to indicate that the work has been accomplished.

 

                  Detailed reports of all accidents resulting in personal injury or any damage to equipment must be kept on file by the Contractor.  Copies of these reports shall be issued to the Contract Administrator.

 

         3.5     Separate Contracts:  The University reserves the right to obtain competitive proposals for work not covered in these specifications, including alterations.  The Contractor will cooperate with any contractor retained under such conditions.

 

  3.6      Laws and Permits:

 

3.6.1     The Contractor shall comply with all Federal, State, and Municipal laws and ordinances, prepare all documents, give all notices, obtain all permits necessary for the work, pay all costs and fees for permits and inspections and obtain all certificates of inspections and approval for the work and deliver same to the Contract Administrator or designee.  This does not include annual State safety inspections and certificates, but does include tests required to pass State safety inspections.

 

3.6.2     The Contractor shall immediately inform, in writing, the Contract Administrator or designee, of any work conditions or materials which violate any of the above laws and regulations.  Any work done by the Contractor causing such violations shall be corrected by the Contractor at the Contractor's own expense.

     

        3.7      Service Requirements:

 

3.7.1     General:  All maintenance performed under this contract shall be of the highest quality to protect all elevator equipment from deterioration and to insure performance to manufacturer's specification.

 

3.7.2     Design:  The Contractor will maintain the original design speed for each elevator car, in feet per minute, the original performance times, which include acceleration and retardation, as designed and installed by the manufacturer (adjusted for age of unit).  The Contractor will also perform the necessary adjustments as required to maintain the original door opening and closing time, within limits of applicable codes.  The Contractor shall attempt to maintain leveling and re-leveling at + or – ¼ inch.  However due to the age of some units, the University will accept leveling and re-leveling at + or – ½ inch.

 

3.7.3     Inspections:  It is the responsibility of the Contractor to maintain all equipment in safe operating condition as required by law or regulation.  In conjunction with this requirement, periodic inspections of the elevators shall be performed as required by the National American Standard Safety Code for Elevators and Escalators.  The requirements of all other codes and regulations will be followed.    

 

3.7.4     Return of Premises:  Upon completion of any services, the Contractor's employee will return all space disrupted by maintenance work to a neat and clean condition.

 

3.7.5     Annual Test:  Once each year when due, the Contractor shall furnish all labor, equipment and test weights and shall obtain and pay for all permits and fees to make the annual test of the safety devices on all elevators as required by ANSI A.17:2.  Copies of the inspection certificates shall be maintained in each elevator car by the Contractor and the originals furnished to the University.

 

3.7.6     Five Year Tests:  The Contractor shall perform Five Year Tests when they come due.

 

 

3.7.7     Joint Inspection:  Ninety (90) days before expiration of the contract, or another agreed upon time, the University and the Contractor shall make a joint inspection of all equipment covered by the contract.  The Contractor shall notify the University in advance of the inspection.  Any defective parts found during the inspection which comes under the scope of the contract, shall be replaced by the Contractor within thirty (30) days.

 

        3.8      Equipment Covered:  includes, but is not limited to the following items:

 

a.   Machine, worm gear, thrust bearings, drive sheave, shaft bearings, brake pulley, brake coil, brake contact, linings, and component parts.

 

b.   Motor and motor windings, rotating element, commutator, brushes, brush holders and bearings.

 

c.   Controllers, selector and dispatching equipment, all relays, solid state components, circuit boards, resistors, condensers, transformers, contacts, leads, dashpots, timing devices, computer devices, steel selector tape and mechanical and electrical driving equipment.

 

d.   Governor, governor sheave and shaft assembly, bearings, contacts and governor jaws.

 

e.   Secondary sheave, bearings, car and counterweight buffers, car and counterweight guide rails, top and bottom limit switches, governor tension sheave assembly, compensating sheave assembly, counterweight and counterweight guide shoes including rollers and gibs.

 

f.    Hoist and governor ropes and rope fasteners.

 

g.   Hoist way door interlocks, hoist way door hanger, bottom door guides and auxiliary door closing devices.

 

h.   Automatic power operated door operator, car door hanger, car door contact, safety edges, electric eyes and other door protective devices, load weighing equipment, car frame, car safety mechanism, and platform.

 

i.    Elevator car guide rails and shoes, gibs or rollers when necessary to insure smooth and quiet operation.  Except where roller guides are used, guide rails will be kept properly lubricated.

 

j.    Elevator position indicator panel including all wiring to elevator cars and controllers.

 

k.   Elevator intercom and emergency alarm system including all wiring to cars, panels and through controller.  The Contractor is responsible for all wiring to box.  The Contractor is not responsible for repairing the actual phone.

 

 

l.    Pumps, pump motors, drive belts, operating valves, valve motors, leveling valves, plunger packings, exposed piping, hydraulic fluid.

 

m.  Sump pumps and alarms (inspection only).

 

        3.9      Items not included in this contract:

 

                  a.  Hoistway door hinges, panels, frames, gates and sills.

 

b.   Car flooring and removable panels unless damaged by failure of parts or service covered by this contract.

 

c.   Car doors.

 

d.   Car ceiling and light fixtures.

 

e.   Cover plates for signal fixtures and operating stations.

 

f.    Casings, and all underground hydraulic piping and connections.

 

g.   Hoistway structural steel, concrete and/or other structural material unless damaged by failure of parts or service by this contract.

 

        3.10    Maintenance Requirements:

 

3.10.1   Repairs and Replacement:  The Contractor will regularly, on a scheduled basis, completely examine, adjust, clean, lubricate, and when conditions warrant, repair or replace any component of the elevator system to guarantee original design conditions and performance characteristics.

 

3.10.2   Guide Rails:  The Contractor will keep the guide rails properly lubricated at all times except where roller guides are used, and when necessary, renew guide shoe gibs or guide rollers in order to assure smooth and quiet operation.

 

3.10.3   Safety Devices:  The Contractor will periodically examine all safety devices, and will adjust, repair, or replace as necessary.

 

3.10.4   Cables:  the Contractor will repair and/or replace defective electrical conductor traveling cables and hoistway wiring.

 

3.10.5   New Parts:  The Contractor will furnish new parts and lubricants obtained from or recommended by manufacturer of equipment or equal, approved by the Contract Administrator or designee.

 

3.10.6   Interlocks, etc.:  The Contractor will also examine, lubricate, adjust, repair, and/or replace the following equipment:  interlocks, door closures, car and hatch door hangers, signal systems and car door operators.

 

3.10.7   Manufacturer's Instructions:  the Contractor will perform all maintenance, adjustments and inspections according to original manufacturer's recommendations and will keep current on techniques and requirements.

 

         3.11   Vandalism: If repair work performed by the Contractor is due to vandalism and the Contractor can document that damage is due to vandalism, to the satisfaction of the University, then the University will bill that damage to student residents.

         3.12   Performance:  The following inspection and maintenance operations shall be followed in carrying out the performance of this contract.  This constitutes the minimum of operations and frequency of performance to be provided.  The Contractor must recognize that additional services may be required to comply with performance and safety requirements.

            3.12.1   Monthly Services:

 

a.   Ride each elevator, check operation of car and hatch doors, safety edges, sensing devices and/or electric eyes, acceleration and slow down speed, floor stops and leveling.

 

b.   Inspect and wipe clean all motors, machines, and generators.  Wipe clean all motor and commutators, clean and check brushes and brush holders.  Renew and/or reset brushes if necessary.  Inspect the brake operation.  Check shoe to brake pulley clearance and adjust as required for proper operation.  Check and lubricate hoist machine bearings.  Check and add lubrication to the gear box if necessary.  Inspect drive and secondary sheaves, clean if required, check bearings for proper operation and wear.  Examine machine gear teeth for cutting and noise, repair and/or adjust as needed.

 

c.   Inspect controllers, selectors and governors.  Clean and lubricate direction and accelerating switches.  Clean and adjust all controller and selector contacts.  Replace worn contacts and/or shunts where necessary.             

 

d.   Lubricate the governor shaft bearing.  Inspect working parts of all governors for free operation.  Clean and lubricate as necessary.  Check contacts, shaft, bushings and rubbing surfaces for cleanliness and wear.

 

e.   Clean the hoistways, landing and car sills, all ledges, tops of elevators and pits.

 

f.    Examine all hoistway ropes and fastening for wear and breaks, check and adjust rope tension, rerope if necessary.  Examine all governor ropes for wear and proper tension.  Adjust tension weight and/or shorten the governor ropes where necessary.  All hoist and governor ropes shall be kept clean.

 

g.   Examine all traveling cables for wear and position.  Replace worn or frayed cables.

 

h.   Inspect door monitoring equipment and safety edge units.  Clean, lubricate, adjust or repair as necessary.  Clean and lubricate all hoistway and car top switches for worn rollers, bearings and linkages, renew where needed.  Examine all hoistway and car top leveling devices for alignment.  All switches shall be adjusted to activate upon contact.  The proper lubricants shall be applied to all roller arms, pivot points and switches.  All switches shall be caused to function to insure proper operation.  Inspect all door operating equipment, including motor brushes, commutators, belts or chains, contacts, car door clutches and releasing rollers.  Clean, lubricate, adjust or renew as necessary.  Examine door locks, door closer equipment, hanger rollers and tracks, clean, lubricate and renew where necessary.  Examine the car and landing door up-thrust, adjust or replace the door eccentrics where necessary.  Examine landing door gibs for wear and alignment.  Renew worn gibs where needed.

 

i.    Examine the car and counterweight guide shoes, rollers, fastenings, renew worn or damaged rollers and guide shoes to prevent excessive movement of car and counterweight and to prevent excessive wear of rollers and guides.

 

j.    Light bulbs located in hall lantern fixtures, pits, car stations, hall push button stations, elevator mechanical rooms, position indicators shall be replaced upon their failure to light.  All bulbs shall be of the same type and voltage of those to be replaced.  The car push stations shall be cleaned on a regular basis.  All working parts of the car stations shall be inspected in insure they are operating properly.

 

k.   The top and bottom access switches and the car top inspection station shall be maintained in working order.  All defective switches shall be replaced.  The access operation shall comply with the elevator codes.

 

l.    Inspect and wipe clean all motors and pump units.  Inspect drive belts for wear and excessive slack.  Inspect the entire hydraulic system for oil leaks.  All leaks shall be repaired immediately.

 

m.  Written documentation as to the performance of the monthly services shall be provided to the Contract Administrator or designee for each elevator.

 

3.12.2   Annual Services:

 

a.   Examine, clean with proper solution, and repair as necessary, commutators, brushes and brush holders of all small control motors and regulators.

 

b.   Thoroughly examine and clean starter and control panels.  Check each contact and relay by hand for wear, cleanliness and proper adjustment.  Clean, readjust, repair or replace as necessary.

 

c.   Check, clean and adjust operation of slow down and limit switches.

 

d.   Blow out and vacuum controllers, and hoist motors.  Test winding insulation condition.  Record results.

 

e.   Examine, clean and adjust all moving parts of the governors and safeties for free operation.  Perform actual test of safety at slowest operating speed, with no load.

 

f.    Drain machine gear oil, repair any oil leaks, examine gear teeth, and refill with new gear oil.

 

g.   Overhaul machine brake, including disassembly, cleaning, replacement of worn components, reassemble and readjustments.

 

h.   Clean and inspect hatch door hangers, tracks, rollers and gibs.

 

i.    Clean car tops, pits, overhead sheaves and beams.  Check all bracket and fishplate bolts for tightness.

 

j.    Remove hall and car station covers, blow out and clean buttons and switches.

 

3.12.3   Emergency Call Back Service:  The Contractor will be required to provide overtime emergency    call back service as required by these specifications and shall be rendered at any hour, on any day of the week required, and the Contractor shall respond within two (2) hours of notification of each such requirement from the University.  For trapped passengers, response time shall be within 30 - 45 minutes.  After hours calls will be paid at the overtime rate as noted on the proposal unit price form.

 

3.12.4   Mechanic Qualifications:  The Contractor will provide one primary elevator mechanic who will be responsible for and oversee all work.  Other mechanics and apprentices will assist as necessary.  All mechanics will hold a current Maine Elevator license, and be thoroughly familiar with maintenance, repair and troubleshooting requirements for installations listed in this specification.  Mechanics will be interviewed by the University for acceptability prior to assignment to the site.  The Contractor will also provide other mechanics fulfilling the same qualifications to provide for continuing service during absences of the regular mechanic.  The Contractor will provide copies of licenses and qualifications of all personnel assigned to this contract.  No personnel may be assigned to or removed from this site without prior approval of the Contract Administrator or designee.

 

         3.13   Communications:  It is expected that the Contractor, generally through the primary mechanic, shall maintain good communications with the Department of Facilities Management regarding the following:

 

a.   Prompt notification of major work required, safety related or serious problems, and unusual  circumstances.

 

b.   Notification of any damaged or abused equipment.

 

c.   Notification of any equipment not operating as designed.

 

d.   Notification of shutdown of any equipment.

 

e.   Communication with the manufacturer to determine required modification to equipment or servicing methods and adjustments.

 

f.    Feedback of maintenance problems, and equipment performance through clear and well documented service slips.

 

g.  All elevator service people will report to the Contract Administrator or designee during normal working hours and USM Police after hours prior to starting work.  A sign in and out log must be maintained before and after all work on a daily basis.  Service slips shall be turned in to the Contract Administrator or designee during normal working hours or the next business day.

 

h.   Written documentation as to the performance of monthly services shall be provided to the Contract Administrator or designee.

 

i.    Contractor shall arrange quarterly update meeting with the Contract Administrator or designee.

 

         3.14   Documentation:  The University requires that the Contractor maintain full documentation covering performance and such documentation will be maintained at the Department of Facilities Management.  This will include, but not be limited to, the following:

 

a.   Within thirty (30) days after award of contract, the Contractor shall develop a written Preventive Maintenance program including a schedule of required work, P/M and repair record forms, and maintenance testing procedures.

 

b.   Monthly report of all elevator service calls and failures, and a chart of "call backs" by day and elevator.

 

 

c.   Monthly report of major or safety related problems encountered or any equipment not operating to design specifications.

 

d.   Preventive Maintenance records and repair logs to document all work done for each elevator.  Original maintenance records will remain in the elevator mechanical room as the University's property.

 

e.   All changes in writing of the elevator components will be recorded on the University's plans and specifications maintained at the elevator mechanical room.

 

f.    The Contractor shall immediately notify the Contract Administrator or designee of defects or required modifications in the elevators which the Contractor considers to be beyond the scope of this contract, and shall furnish the University with a detailed written estimate of the repair costs.  The Contract Administrator or designee will then determine if and when the work needs to be done and if it can be accomplished within the scope of the contract. The Contract Administrator or designee will have the defect corrected as it deem is appropriate.

 

g.   Annual performance testing including speed readings to verify and document maintenance of all original design performance characteristics.

 

h.   Written documentation as to the performance of monthly services.

 

i.    Failure to comply with any of the above may result in non-payment.  Work shall not be considered performed if written documentation and sign in logs are incomplete.

 

         3.15   Elevator Downtime:  The following guidelines shall be considered the maximum allowable downtime for repairs listed.  The Contractor shall ensure that repairs are expedited to minimize downtime in all cases.  Not more than one elevator shall be put out of service at one time for regular maintenance, lubrication and servicing.  When an elevator is taken out of service, how and when the elevator is to be put back into service shall be scheduled with the University in advance.  For “critical units” - defined as passenger elevators that have no backup passenger elevators servicing the same building and levels - maximum allowable shutdowns must be less than the times listed below and are to be limited to the fullest extent possible.

 

            3.15.1   Major repairs:

 

                        a.   Cables-hoist, and governor ropes:  3 working days to complete.

 

                        b.   Motor field coils:  15 working days to complete.

 

c.   Rewind motor armatures:  28 working days (10 working days for an elevator without backup).

 

d.   Turn-down and undercut motor commutator:  4 working days.

 

e.   Replace motor bearings:  3 working days.

 

f.    Repacking of pistons:  1 working day.

 

g.   Replacement of pump motor:  3 working days.

 

h.   Repair or replacement of control valves or pump:  1 working day.

 

                  3.15.2   Minor Repairs:  (Completion within one (1) working day)

 

                              a.   Repair governor

 

                              b.   Replace relays or coils

 

                              c.   Replace door interlocks

 

                              d.   Replace door gibs

 

                              e.   Door operator repairs

 

                              f.    Repair selector

 

                              g.   Replace door operator motor

 

                  3.15.3   Minor Repairs:  (Completion within two (2) working days)

 

                              a.  Replace selector

 

                              b.   Replace brake linings

 

c.   When an elevator without backup is shutdown, a sign shall be placed at each opening, indicating that the elevator is being serviced and which stairwell is available for use.

 

         3.16   Repair Parts Availability and Characteristics:  To assure the maximum use of the elevators and a minimum of downtime for emergency repairs, the Contractor will be required to maintain a supply of spare parts sufficient for normal maintenance and repair of the elevators. These spare parts shall be genuine, original manufacturer's parts or approved equal.

 

                  The elevators are to be maintained to original design, conditions and performance characteristics.  If equipment has obsolete parts, with no current direct replacement, the parts will be replaced with new non-proprietary parts so as to maintain the elevator’s original design and performance characteristics.

 

         3.17   Availability of Rotating Elements:  The Contractor is expected to maintain an inventory (in stock or available within 24 hours) one pump, motor and set of valves for the equipment covered by this contract.  Exceptions / problems will be evaluated by the University on a case-by-case basis.

 

         3.18   Parts Costs:  The University reserves the right to audit the Contractor’s records to determine cost.

 

         3.19   Work Hours:  Normal work shall be accomplished 8:00 a.m. to 4:30 p.m. Monday through Friday.

 

         3.20   If the University requires and authorizes emergency call back services (24 hours a day) or overtime work not included in this contract, such as examinations or repairs, the University will compensate the Contractor for labor costs (at single time rates) and other pre-approved costs.

 

 

 

 

 

 

4.0     PROPOSAL CONTENT:

 

                  Bidders shall ensure that all information required herein is submitted with the proposal.  All information provided should be verifiable by documentation requested by the University.  Failure to provide all information, inaccuracy or misstatement may be sufficient cause for rejection of the proposal or rescission of an award.  Bidders are encouraged to provide any additional information describing operational abilities.  Responses to each requirement below should be in order and clearly marked with the section number to which they respond.

 

         4.1     Business Profile:

 

                  4.1.1     Financial - Bidders need only supply one copy of the following with their                               proposals.

Public Companies

-audited annual reports for the last three years

-history and description of the company

-recent reports from securities analysts

-published reports about the company

 

Private Companies

-audited financial statements or tax forms from three years

-history and description of the company

-published reports about the company, if any

 

                  4.1.2     Credit rating/report, letter from bank, suppliers.

 

         4.2     Qualifications:  The University intends to award this contract to a vendor with a proven track record, experienced personnel and the equipment required to provide the services required by this Request for Proposal.

                 

                  4.2.1     Provide a statement or other evidence that your firm is regularly and wholly engaged in the repair, maintenance and modifications of elevators and elevator related equipment.

 

                  4.2.2     Submit a list of all higher education accounts that your firm has with the number of elevators and length of time you have held the contract(s).

 

                  4.2.3     For the past three years (1999 – 2002), provide a list of accounts that your firm has lost or were terminated and the reason(s) for their loss.

 

                  4.2.4     Provide evidence that your firm has successfully established and maintained a full preventive maintenance program, for a period of not less than five consecutive years during the period 1996 to 2002, on elevators of the same manufacturer, of approximately the same age, with similar equipment controls, operations and components parts as the elevators covered in this Request for Proposal.

 

                  4.2.5     Provide evidence that your firm has a thorough working knowledge of the engineering data, writing, specifications and materials of the specific elevator equipment to be covered by this contract.  The University may, at its option, inspect your facilities prior to the contract award.

 

 

 

                  4.2.6     Provide complete resumes for all personnel to be assigned to this contract.  Provide certificates and / or licenses, if applicable.  Are the service mechanics employees of your company?  To what extent are they bonded?

 

                  4.2.7     Describe your ability / plan to provide continuous service if the primary mechanic(s) is/are unavailable or in other abnormal circumstances.

 

                  4.2.8     Provide a copy of your lockout and tagout procedures.

 

&n